Discovery · a distributor with its own warehouse
PERO
How much of this is really development? The answer after three weeks of Discovery
A warehouse on paper waybills, accounting in 1C (the accounting and ERP system common in Eastern Europe) and three or four Excel files, about a thousand SKUs. We mapped the processes, designed the target scheme and produced a requirements register that shows for each item whether it is configuration or development, and by what criterion to accept it.
Sample interface, no client data
SKUs in a warehouse built for 50-70
requirements met by Odoo configuration
Distribution with its own warehouse, B2B supplies to chains and retail outlets
~1,000 SKUs, a rented warehouse with 7-9 m racking
Odoo 19 Enterprise: warehouse, batches, packaging, returns; the first stage with no custom code
1C (exchange scheme in progress), the delivery service (manual in the first stage, connector later)
Discovery July 22 - August 12, 2026, then prototype configuration
Analysis, configuration, testing, training
Discovery, then prototype configuration
Prototype configured and shown to the client, the 1C integration scheme in progress
The warehouse is rented, with racking seven to nine meters tall. That once suited a range of 50-70 SKUs in large batches. Now there are around a thousand SKUs, batches are smaller, and the lower picking levels can't hold the whole matrix. The lifts run every day and slow every operation down. Records were kept in 1C and Excel, while the warehouse ran on paper, so goods moved faster than the records were updated.
The consequences named at the meetings were concrete: discrepancies between the records and the physical count, picking errors, customer claims.
Multi-level paper receiving
Warehouse workers count boxes at the gate, the warehouse manager passes the records to accounting, and an accountant keys them into 1C by hand. Checks run on paper sheets across several levels.
Batch tracking is missing entirely: batches aren't recorded anywhere in a system.
Manual picking prioritization
The warehouse manager sets order priority by hand in Excel. Picking goes by paper waybills.
The logistician creates carrier waybills by hand, keeps statuses in Excel and checks by phone.
Bureaucratic return processing
The courier brings a return without warning, the data goes into a spreadsheet, and the picker creates three documents in 1C: defect, write-off, return.
Warehouse stoppage for inventory counts
A full inventory count would stop the warehouse, and the business can't afford that. Partial recounts are manual and considered unreliable.
Nine blocks of warehouse operations
From receiving goods to staff bonuses, with accounting and integration reviewed separately.
Ordered and unordered unloading, location planning, sticker labeling of imports, display kitting, reclassifications
At which step the batch number can be entered: at the dock or at put-away
Packaging and shipping units
A packer workstation, several boxes per shipment, a custom label for each box
Manual grouping of pickings by recipient into one pick
What is generated at shipment, whether the delivery method is tied to the order, whether statuses and weight carry over
Condition, defect, shortage, search by waybill number
Transfers and inventory counts
The chain of warehouse manager, accounting and 1C, and how to shorten it
How to tie the variable part of pay to completed work
Accounting and integration
A separate meeting, the 1C exchange plan, templates for loading data into Odoo
We work through processes on the facts
Discovery ran as a series of working meetings by process block, and the key meetings had written minutes. The as-is diagram shows the problems: which Excel files will disappear, which manual operations will be automated, which functions are missing today. Before finalizing the target scheme, the roadmap includes a mandatory on-site visit to the warehouse.
Kickoff with the warehouse team and a process review
Working meetings by block, minutes
The as-is diagram, then a checklist of open questions
The target scheme, requirements register, configuration plan
Research first, then the to-be diagram: until the questions in the three blocks of uncertainty (receiving, packaging, delivery) are closed, the target process can't be drawn, because the answers change its architecture.
On the client's side, the service terms for their customers were collected separately: shipping deadlines, return rules. These are the input for order prioritization.
The “one delivery, one worker” constraint was removed with no customization
We discussed three schemes. Two-step receiving: receiving closes the supplier order, put-away is separate. One-step: one person receives and puts away at once. Hybrid: goods are received into an entry zone, and then several people take turns putting them away into storage. We chose the hybrid. The reason is a constraint: for one order the system creates one receipt document, and one person works with it. The hybrid gets around this with a partial receipt and a remainder on an internal transfer.
Receiving closes the supplier order, put-away is separate.
One person receives and puts away at once.
Goods are received into an entry zone, and then several people take turns putting them away into storage.
A CONSTRAINT IN THE REGISTER
The constraint is written into the register in advance
A remainder on the transfer gives sequential work by several people, not simultaneous. If simultaneity is what the client really needs, that is no longer standard functionality but a separate customization, and the estimate will change. We put this in the register as its own line with the status “to verify” and made it the first, blocking question to the client. That keeps the first-stage estimate accurate.
Several warehouse workers working on one receipt at the same time
WHAT COMES OUT OF THE BOX
A connector to the local carrier: a fallback option for the first stage
We compared the list of carriers available in Odoo, and there is no ready connector for a Ukrainian carrier among them. We agreed a fallback: a delivery method with a fixed price and a “waybill number” field. A full connector is outside the first stage and clearly marked as such: without test API access the estimate is unreliable.
Receiving goods in three steps: entry zone, batch, put-away
We enter the batch number at the entrance. That way it doesn't get lost when several warehouse workers take turns putting a delivery away.
What is planned for implementation
What is already in the configuration plan
Receiving in two steps with put-away by several warehouse workers in turn.
Batch tracking: the batch number at receiving, inherited on transfer.
Three states for returns: condition, defect, shortage. Instead of three tables and three documents in 1C.
Several boxes per shipment, package types, a custom label.
Grouping orders by recipient.
The carrier's delivery method and a “waybill number” field with return lookup by it.
Roles: warehouse worker, warehouse manager, logistician.
Staff motivation through the Odoo Studio builder without a separate module.
This is the first-stage plan. On the prototype, the put-away rules, the aisle sequence number and batch capture on the move from the entry zone to storage are already configured, and the prototype has been shown to the client.
Three Excel tables and three documents in 1C for a single return
From kickoff to a prototype shown
Kickoff with the warehouse team, first working meeting: analysis of current warehouse processes
Minutes and an as-is process diagram. Roadmap: three phases. The delivery solution worked out, the motivation solution begun
The as-is diagram supplemented with process problems and sent to the client
Meeting on architectural forks: receiving, packaging, delivery. A checklist of open questions
The to-be diagram, requirements register, configuration plan, list of customizations. Discovery closed
Analysis of the carrier module, a meeting with accounting and the 1C integration plan, data loading templates
On the prototype: put-away rules, aisle sequence number, batch capture on the move from the entry zone to storage
The prototype with demo data shown to the client, handover of functionality and agreement on next steps
Prototype shown to the client
What is in progress now
The 1C integration scheme: scope and timing are being clarified.
The client's answer to the blocking question: is sequential processing enough at receiving.
The carrier connector, after we get test API access.
Who this approach suits
Wholesale with outdated records (1C/Excel)
This is a very common profile.
Businesses with batch tracking
Goods that must be tracked by batch.
Buyers who need a development estimate
The verdict on each requirement shows how much is configuration and how much is development.
Companies at the budget approval stage
The Discovery package can go to the committee no matter who implements it afterwards.
Warehouses with team receiving
Receiving into the entry zone and put-away by several warehouse workers in turn, with no customization.
E-commerce with returns from delivery services
Three item states instead of three files, and return lookup by waybill number.
We will show it on your company's processes
We take your process and show what standard Odoo covers and what is really worth extending.
We will get back to you promptly.
Or pick a convenient call time in the calendar → More case studies →Kyiv, 9a Vaclav Havel St Official Odoo Partner
Pricing and support What is standard Odoo Manufacturing Warehouse Logistics Retail Fitness and sports Wholesale and distribution Agri trading HoReCa Book a demo →© 2026 graz.tech · Official Odoo Partner
A prototype in the first package.